Fabrication
Tankweld’s factory is located in Carrum Downs Victoria, south east of Melbourne.
Our expertise extends to a vast range specialist aluminium, stainless steel and carbon steel rolling, bending and fabrication services.
When it comes to handling larger fabrications, our 3000m² factory is fitted with three overhead cranes with a capacity of up to 10 tonne.
Our team of qualified welders and skilled tradespeople are proficient in using MMAW, TIG, FCAW, SST and MIG welding and fabrication processes in the following areas:
- Pipe spools and systems for conveyance of oil, gas & water in compliance with AS 1554,
AS 3992, AS 4041 & ASME B31.3 from stainless and carbon steels, including MSCL/MSEL piping. - Welded stainless & carbon steel tanks of any shape or size, including self-bunded diesel
and flammable liquid storage tanks and day tanks in compliance to AS 1692 and AS 1940 - Structural steel fabrications in accordance with AS 4100 & AS 5131
- Tank, Silo and Pressure Vessel fabrications in accordance with AS 1210, AS 1554,
AS 3774 & AS 3990 - Fabrication of industrial access platforms, walkways, handrail systems, stairways, ladders and guarding in accordance with AS 1657.
- Quality assurance documentation is available on request.
Explore our Fabrication Services
Tanks
• Chemical Storage
• Diesel Fuel Tanks
• Self-Bunded
Materials
• Aluminium
• Stainless Steel
• Steel
Safe Access
• Chemical Storage
• Handrail Systems
• Mesh Cages-Gas & Water Trains
• Pit Lids
• Turret Tops
traditionrolex.com
Structural
• Ladders
• Platforms
• Stairways
• Walkways
Piping
• Carbon Steel
• MSCL
• MSEL
• Stainless Steel
Fabrication Capabilities
- 3,000m² floor space
- Dedicated and separate workshop area for stainless steel storage & fabrication
- 4 loading bays with 5m x 6m high roller doors
- 8m x 8m work bays – 5 off general work + 5 off dedicated stainless steel
- 1 off x 10 tonne overhead crane, 6.5m under hook
- 2 off x 5 tonne overhead cranes, 6.5m under hook
- Hydraulic brake press – 110 tonne x 3.2m
- Hydraulic press – 100 tonne
- Shear punch – 55 tonne
- Guillotine – 2.5m wide x 6mm thick
- Folding machine – 2.5m wide x 3mm thick
- Plate roll forming machine – 3m x 16mm thick
- Plate roll forming machine – 1.3m x 6mm thick
- Centre Lathe – 40cm swing x 102cm bed
- Radial drill – 1.2m arm with 300mm spindle travel
- Power hacksaws – 600mm wide x 400mm deep
- Pipe rotators – vertical & horizontal
- SST / MIG / TIG welding to AS3996 / AS1554 / AS1665
- Toyota Fork Lift – capacity 2.5 tonne
- Mitsubishi flat tray truck, 12 tonne GVM
- Isuzu flat tray truck, 10 tonne GVM
- Isuzu flat tray truck, 6 tonne GVM
- Mitsubishi Triton ute – 1 tonne capacity
For more information on our Fabrication Services
Contact UsRecent Projects
Boneo WP Clarifier Installation
Engineering
Installation
Construction of a new clarifier was undertaken, and Tankweld were tasked with assembling and installing all mechanical components for
this clarifier.
ETP Sludge Digestion Capacity Upgrade
All Services
Tankweld was subcontracted to fabricate and install free-issued mechanical equipment, along with fabricating and installing associated structures, stainless steel piping and pipe supports.
Healesville STP Sludge Tank
All Services
Tankweld was required to design, construct and install a new 225KL litre open-top steel tank consisting of multiple compartments.
WTP Biogas Gas Scrubbers Installation
Fabrication
Installation
Tankweld was engaged to install four FRP Biogas Scrubber Units for processing raw water and fuel gas of a green-field gas scrubber system.